Pioneer in pigging and Hydro testing of offshore / Onshore pipeline services
The Pipeline and process services Professionals

About us

Trans-Asia Pipeline FZC is registered as an independent company in Hamriya free zone Sharjah UAE to serve the growing needs of oil, Gas and Petrochemical industry.

Trans-Asia services include Cleaning, Gauging, Hydro Testing, Dewatering, Drying and Pre-Commissioning Services .

We also offer services for pipeline projects involving cleaning, rehabilitation and conversion .

We also offer pipeline inspection service which gives the general condition of pipelines.

Activities of Business

  • Pipeline Services
  • Pipeline pigging
  • Hydro testing/Pneumatic Testing
  • High Speed Flushing
  • Nitrogen Purging
  • Drying of pipelines
  • Geometric survey
  • Inertisation
  • Pre-commissioning
  • Commission with product
  • Equipments Rentals

Trans-Asia safety policy

  • Trans-Asia is an ISO 9001:2000 accredited company, complying all ISO standards both in terms of QA/QC and HSE procedures.
  • Trans-Asia HSE checklist for hydro Testing operation is as follows:
  • A detailed check list will be prepared as per the standards and specifications. It will cover the testing operation from filling up to completion of operation.
  • Good co-ordination will be ensured so as to avoid performing hydro-test at the same time as other operations. A work permit procedure/ Job hazard Analysis shall be used.
  • The equipment shall be in good condition and adequately maintained and certified.
  • Testing equipment shall be kept as far as possible from recording and pumping stations
  • Testing equipment will undergo a trial checkup before commencement of operations.
  • Test area will be properly barricaded .
  • During the testing operation , all non essential personnel will be kept out of the testing area.
  • The test crew will attend a tool box talk before starting of operations.
  • All personnel will be in their proper PPE during testing operation.
  • Inspection for any leaks shall be performed at least 15 mm after the test pressure has been reached and only by designated personnel.
  • No tampering works or tightening work will take place while the line is under pressure or during pressure –up stages.
  • Presence of mind is essential while operation is in progress.
  • All the above mentioned activities will be effectively supervised by safety officer at site.

Organisation Chart

Pioneer in pigging and Hydro testing of offshore / Onshore pipeline services


Pioneer in pigging and Hydro testing of offshore / Onshore pipeline services

Pioneer in pigging and Hydro testing of offshore / Onshore pipeline services